JKR Project Insurance Quick Pack
Free Download Here
14 days from Letter of Award to site possession. The insurance and bond pack JKR actually checks.
Built for the QS, contracts manager, or owner-director at a Malaysian CIDB G3 to G7 contractor with a fresh JKR Letter of Award.
✔ The 14-day post-LOA insurance and bond timeline
✔ CAR/EAR, Public Liability, WC (foreign workers via SOCSO Employment Injury Scheme since 1 January 2019), Performance Bond at the PWD 203A standard 5 percent
✔ PWD 203A Clause 17, Clauses 32 to 33, Clause 48.1(a) anchors that move the stack
✔ Common JKR rejection triggers and pre-lodgement checklist
For Malaysian CIDB G3 to G7 contractors. Subject to policy terms and conditions. Foundation is a specialist property and engineering insurance intermediary, not a broker.
Forward this to your finance team before bond lodgement.



