Contractor's Construction Insurance Risk Guide

Free Download Here

Thank you!
Oops! Something went wrong while submitting the form.

Risk-by-risk through the Malaysian construction insurance stack, with the PWD 203A and PAM 2018 anchors that govern each.

Built for the QS, project director, or contracts manager at a Malaysian CIDB G3 to G7 contractor running larger or multi-principal projects.

✔ Material damage risks: CAR (civil/building), EAR (M&E erection, commissioning); how they pair on combined projects
✔ Liability and contractor stack: CGL or Public Liability, PI/SPPI for design-build scope, WC including foreign workers via SOCSO Employment Injury Scheme since 1 January 2019
✔ Bond stack: Performance Bond (PWD 203A standard 5 percent of contract sum), APG, Retention Bond
✔ Clause anchors: PWD 203A Clauses 17, 32 to 33, 48.1(a); PAM 2018 Clauses 19, 20A, 20B, 20C; CIDB Act 520 levy mechanics

For Malaysian CIDB G3 to G7 contractors. Subject to policy terms and conditions. Foundation is a specialist property and engineering insurance intermediary, not a broker.

Bring this to your next pre-tender review and your insurance intermediary conversation.

Construction Risk

Get A Specialist Quote / Free Review

Whether it's a construction project, industrial facility, or commercial property in Malaysia, we can structure the right insurance coverage or offer you a free insurance policy review

Thank you! Your submission has been received! We'll be in touch with you soon!
Oops! Something went wrong while submitting the form.